Projects and case studies
Where our systems are installed
14 published projects
Filter by division.
From convention centres, airports and government buildings to hospitals, a car plant, offices, stores and hotels. Each project lists what we supplied and where it was published.

Bharat Mandapam
100 m × 20 mfire curtain
A fire curtain 100 m wide and 20 m high at the International Exhibition-cum-Convention Centre, Pragati Maidan, with smoke curtains across the atrium zones.
-
A second fire curtain installation at the same scale as Bharat Mandapam: 100 metres wide and 20 metres high.
100 m × 20 mfire curtain
-
Close to 60 fire and smoke curtain units across the terminal, linked to its building management and fire alarm systems.
Close to 60fire and smoke curtains
-
Fire and smoke curtains from the fire safety division, and nurse call systems from the hospital division.
2 divisionsfire and smoke curtains, nurse call
-
Single barrel and multi-barrel fire curtains at critical points: corridors, lobbies and open office spaces.
Single and multi-barrelfire curtains
-
Fire and smoke curtains for open-plan, atrium-heavy office campuses, and fire curtains at Amazon warehouses.
Fire and smokecurtains
-
Single barrel and multi-barrel egress fire curtains across loading docks, shopping floors and storage areas, in several store layouts.
3 citiesegress fire curtains, single and multi-barrel
-
120 motorised 27 mm insulated glass blind units in each of four Taj hotels. Window Techs fire curtains are also installed at Taj Hotels properties.
480 units27 mm motorised glass blinds, four hotels
-
139 motorised 27 mm blind units, to the same standard as the Taj Hotels installations.
139 units27 mm motorised glass blinds
-
2-hour fixed fire curtains across seven terminal openings at Noida International Airport, 357.9 m² in all, with a parallel automatic fire curtain scope.
357.9 m²2-hour fixed fire curtains
-
About 30 fire curtains for the large corner conference rooms of Central Secretariat Buildings 1, 2 and 3, each with its own approved shop drawing.
About 30fire curtains, three buildings
-
Fixed fire curtains in a live hospital fit-out at Max Smart Super Specialty Hospital, Saket: 76.19 m² across Ground and First Floor openings.
76.19 m²fixed fire curtains
-
Fixed and automatic fire curtains for the production bays at Maruti Suzuki, Kharkhoda: continuous overlapping runs 4 m high, with spans of 59 m and 131 m.
131 mlongest curtain run, 4 m high
-
Rated steel fire door and shaft door packages for CPWD government office campuses: shafts, exits and compartment boundaries, with documentation for approvals.
IS 3614:2021CBRI-tested steel doorsets
No projects are published here yet for this division. Ask us for references — contact our team.
By division
The divisions behind the work.
- Fire safety
- BÖLDT. Fire safety division
- Drainage
- WTI Drains. Drainage division
- Hospital
- Hospital Solutions. Hospital division
- Hanging systems
- JAM. Hanging systems division
- Window Techs core
- Window Techs. Window Techs core products
Planning something similar?
Call +91 99588 03531 or write to info@windowtechs.in.
Contact us about a similar project
Our sales team replies within 24 hours.

Quick links
Products Categories
Follow us
Copyright 2026 © Window Techs. All Rights Reserved.
Designed & Managed By Attain Mach33 LLP